For under deck roof

Plan to space the 2×4 purlins parallel to the house and 3 ft. on center. To provide drainage, the panels should slope toward the outside edge of the deck about 1/4 in. per foot. If the span under your deck is 12 ft., for example, the purlin at the outer end of the deck should be 3 in. lower than the purlin along the house (12 x 1/4 = 3).

Pitch: 1/4″ per foot.