Backyard To-Do List 2009

The backyard only needs smaller – but as always, labor intensive work to get the yard ready for another year.

  • 32 hours   Brick pathway outline – COMPLETE
  • 04 hours   Patio raised beds — COMPLETE
  • 01 hours   Filling low spots in grass
  • 03 hours   Trim Apple Tree 2010
  • 03 hours   Weed patrol — COMPLETE
  • 20 hours   Shade patio ? 2010
  • 08  hours  Flagstone for path 2010
  • 03  hours  Treat Silver maple 2010

Total Time:   74 hours = 6 weekend (10 hours) plus lunch hours.

One thought on “Backyard To-Do List 2009

  1. The pathway lining is not working as easy as planned. The outside edges of the path are completely lined by landscaping fabric. Short of cutting it to get the metal edging a bricks to sit lower – I have no idea what to do.